Previous activities
2012 – Extention terrace
The outdoor terrace was too small, so we decided to enlarge the terrace.
At the end of April 2013 it was ready! Now we have a large terrace of wood where you can eat or drink something with a great view at the campsite.
2011 – Renovation swimming pool
After 8 years the swimming pool had to be renovated, we made a.o. walls “en pierre” .
2011 – Construction of two cabins
In October 2011 we started with the construction of two cabins. At the end of April 2012 they were ready to rent.